[caption id="attachment_40" align="aligncenter" width="500"]
With that said, I decided to build a proper wet kitchen, and an open space for family gatherings. I quickly drew up a plan as you can see in this previous post.
[caption id="attachment_181" align="aligncenter" width="500"]
After searching for a few contractors willing to take up the job, I finally decided to go with a friend. He is a Bidayuh, and people from his village is known for their fine works in construction. After a brief discussion, we agreed to proceed on the ground works, and I accepted his initial quote of RM29,000 until everything is completed.
The figure seems steep for some, but he assured me that he built things to last, and that the extension of my house will be done with care. I am also quite a believer that most of the times quality does not come at cheap prices.
[caption id="attachment_183" align="aligncenter" width="500"]
Anyway, work started immediately on 4 March 2013 with three local workers from Bau asked to do the ground works. The ground works took about two days as my backyard was filled with stone. Apparently the main contractor for the housing project dumped all the excess materials at my backyard. *Sigh*
As days went by, these three workers worked hard to complete the extension, and I paid them a daily visit to check on the progress. One thing interesting was the fact they took extra care when they were constructing the new kitchen extension. The care they took to ensure the works were done with great precision pleased me. At some point I also noticed they were very tactful when having to negotiate the original house, and ensured no damage came to the original structure. They also constantly kept the house area clean, tiding up after every days work.
[caption id="attachment_185" align="aligncenter" width="500"]
After 13 days of work, the kitchen had already taken shape and even without paint, the extension looked good. At 20 days, the roof was already up, and the extension looked beyond perfect, despite being unfinished and unpainted.
Work progressed even further with tiling works starting. I took the advice of my friend to use acrylic for the kitchen cabinet doors, and took the advice of the 'uncle' to use a black kitchen table top.
[caption id="attachment_184" align="aligncenter" width="500"]
Turned out that their advice was good because after 43 days of construction, the extension was completed, and it was indeed pleasing to see how the whole project turn out at the end.
Apart from that, I also left it to them (the uncles and my friend) to advice on the drainage system, the type of roof, the type of windows and the piping works. Turned out that using the pre-mixed cement blocks you normally see being used in building works is not good. Here they cemented the drain manually, and so far, no water stays in the drain after rain, keeping it dry. The roof is not the thickest of material, but as my friend said, you can play tennis up there. The windows were changed from my initial plan to use swing type windows to 'sliding windows' because they claim it saves space. The cement floor also consist of at least of 4 inch of concrete mix, which to me is quite thick.
[caption id="attachment_182" align="aligncenter" width="500"]
The total damage however had increased to RM35,000 but then, I was indeed satisfied with the works. They also accommodated my request to make the house extension look similar to the original portion of the house. There was little to complain about, and it was obvious that the material used is not cheap.
[caption id="attachment_186" align="aligncenter" width="500"]
Uhhhh.. isn't it a beauty? Can't wait to use it for my house warming!
Woooaaahhh… nice extension. the price increased by 6k ah?? but as long as you feel good bout the work, i think it’s worth to pay additional for the good material and work done :)
ReplyDeleteWoooaaahhh... nice extension. the price increased by 6k ah?? but as long as you feel good bout the work, i think it's worth to pay additional for the good material and work done :)
ReplyDeleteYes!!! Soon to happen!!
ReplyDeletecongratulations! big kitchen area is ecerybody’s dream and u r living it.. post many2 pics of housewarming party ah..
ReplyDelete#hanyamampunanggagambarpostaja
Such a beautiful extended kitchen.
ReplyDeleteThank you bro =) The money spent also beautiful.. hahaha
ReplyDeleteI changed the initial plan to include a store room, and tiles. There’s also some other changes from the original, and hence the increase.
ReplyDeleteI will try.. hehehe.. mun u and jon ada tek.. best gik =)
ReplyDeletekinda look like the original house. nicely done. i have yet to do any renovation to my house. tengah kering kontang. hahahaa
ReplyDeleteGood job! Big kitchen area is everybody’s desire and you have it. I wish I can visit your house soon.
ReplyDeleteThank you =)
ReplyDeleteThis is a great post. I like this topic.This site has lots of advantage.I found many interesting things from this site. It helps me in many ways.Thanks for posting this again.
ReplyDeleteLondon Office Design